







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with







See the difference
Before
After
Before
After
Before
AfterHow Much Does Tub-to-Shower Conversion Cost in West Palm Beach?
A tub-to-shower conversion in West Palm Beach typically costs $3,500 to $10,000 in 2026, with most homeowners paying between $5,500 and $7,500 for a standard 60-inch alcove conversion using quality fixtures and tile. The final price depends on the size of the opening, the materials you choose, whether plumbing needs to move, and the condition of the subfloor once the tub comes out. At Elmstead Remodeling West Palm Beach, you’ll get a written price before any work starts, so the number you see is the number you pay.
If you’re researching your options, our Tub-to-Shower Conversion in West Palm Beach guide walks through the full process from demolition to final grout. This page focuses on cost: what drives it, where the money goes, and what to expect at each price point in this specific market.

Key Takeaways
- Typical range: $3,500 to $10,000 for a tub-to-shower conversion in West Palm Beach.
- Mid-range project: $5,500 to $7,500 covers a standard alcove with tile surround, new valve, and glass door.
- Largest cost drivers: moving the drain or plumbing, custom glass, and waterproofing upgrades.
- Timeline: Most conversions take 3 to 7 working days, with larger or custom layouts running longer.
- Written price promise: Elmstead Remodeling West Palm Beach provides a written price before any work starts, every time.
Tub-to-Shower Conversion Cost Breakdown (2026)
Here is where the money goes on a typical West Palm Beach tub-to-shower conversion. These ranges reflect what we see across Palm Beach County in 2026, accounting for local labor rates, material costs, and the specific building code requirements in South Florida.
| Line Item | Typical Cost Range | Notes |
|---|---|---|
| Demolition and haul-away | $400 – $900 | Removing the old tub, surround, and debris. Includes disposal fees at county facilities. |
| Plumbing adjustments | $300 – $2,500 | Low end: swap drain to accommodate shower. High end: relocate supply lines or drain in slab. |
| Shower pan or base | $400 – $1,800 | Acrylic or cast polymer base on the low end; tile-ready pan with waterproofing membrane on the high end. |
| Wall surround / tile | $1,200 – $5,000 | Ceramic tile starts around $8/sq ft installed; porcelain and large-format tile run higher. Schluter waterproofing behind tile adds $500 – $1,000. |
| Shower valve and trim | $250 – $900 | Moen and Kohler valves with pressure-balancing are code-required. Premium trims and finishes add cost. |
| Shower door | $500 – $2,000 | Framed sliding doors on the low end. Frameless glass with custom sizing runs $1,200 – $2,000. |
| Accessories (grab bar, niche, bench) | $100 – $800 | Recessed niches with Schluter edging run $150 – $400. Fold-down teak benches run higher. |
| Permits | $150 – $500 | West Palm Beach requires permits for plumbing changes. Elmstead pulls permits on every job. |
What pushes a project toward the $3,500 end? A standard 60-inch tub-to-shower swap with an acrylic surround, a basic sliding door, and no plumbing relocation. What pushes it past $8,000? Frameless glass, large-format porcelain tile, a tile-ready shower pan with full waterproofing, a rain head plus handheld, and moving the drain a few inches to center the shower. Add a bench and a couple of Schluter niches with custom trim, and you’re at $9,500 to $10,000.
In neighborhoods like Flamingo Park, Grandview Heights, and the El Cid historic district, older homes often have cast-iron tubs and galvanized supply lines. Removing a cast-iron tub in a second-story bathroom where the crew has to carry sections down a winding staircase adds labor. We factor that into the written price before we start, not as a surprise later.

What Affects Tub-to-Shower Conversion Pricing in West Palm Beach
Every home is different. Here are the specific factors that move the price in this market.
- Slab-on-grade plumbing. Many West Palm Beach homes built after 1960 sit on concrete slabs. If the drain needs to move, the plumber cuts into the slab, reworks the PVC or cast iron, and patches the concrete. A drain relocation in slab can add $1,000 to $2,500 by itself. Pier-and-beam homes, less common here but present in some older historic neighborhoods, are usually cheaper to access.
- Shower door choice. A framed sliding door from a big-box supplier lands around $500 to $800 installed. A custom frameless panel, measured and fabricated for your specific opening, runs $1,500 to $2,000 or more. The difference is visible every day.
- Waterproofing method. A basic fiberglass surround has a lower material cost, but it limits your design options and won’t last as well in South Florida humidity as a tile surround with a Schluter membrane behind it. The Schluter system adds real cost, and real protection.
- Fixture brand and valve type. A pressure-balancing shower valve is required by code in West Palm Beach, so that’s not optional. But the trim you choose on top of that valve changes the look and the price. Moen and Kohler both make reliable valves from about $250 to $600, and the trim runs the same range again or higher for brushed nickel or matte black finishes.
- Existing water damage. We remove the tub and sometimes find the subfloor or drywall behind it has been quietly absorbing moisture for years. In West Palm Beach, where air conditioning runs ten months a year and bathrooms stay humid, subfloor rot behind old tubs is common. Replacing a section of subfloor adds $300 to $800 depending on what’s accessible.
- Age of the home and framing. A 1950s bungalow in Southland Park may have studs that aren’t consistently 16 inches on center, or a tub alcove that isn’t a standard 60 inches. Custom framing and shimming add a few hundred dollars and some time.
How to Save on Tub-to-Shower Conversion
You don’t have to spend $10,000 to get a shower you’ll love for years. Here is where you can trim without cutting into what matters: waterproofing, licensed plumbing, and a proper permit.
- Keep the drain where it is. The single biggest controllable cost is plumbing relocation. A standard tub drain can work for a shower if the shower pan is designed for that drain placement. Ask your contractor about a pan that uses the existing drain stub before you start moving things.
- Choose a tile-ready pan over a full custom mud bed. A mud bed is a beautiful, traditional building method, but it costs more in labor and time. A tile-ready foam pan from Schluter, properly set and waterproofed, performs the same function and saves several hundred dollars.
- Pick ceramic tile over porcelain for the walls. Both are appropriate for shower walls. Porcelain is denser and more durable on floors, but ceramic is easier to cut, costs less per square foot, and gives you more design options for the same budget.
- Skip the second shower head. A rainfall head feels luxurious, but running the supply line up and over the valve adds plumbing labor. A single quality shower head with a well-chosen trim package gets you a great daily shower for less.
- Get the written price and understand it. Elmstead Remodeling West Palm Beach gives you a written price before any work starts. If you’re comparing quotes, put them side by side and look at what’s included: permits, demo, haul-away, waterproofing, and the specific fixture brands. A lower bid that doesn’t include haul-away or that uses a lesser waterproofing system isn’t actually lower.
We offer free estimates on every tub-to-shower conversion. Call (728) 203-3270 and we’ll walk through what your specific bathroom needs, with a written number at the end.
Why West Palm Beach Homeowners Choose to Convert
The tub-to-shower swap is one of the most requested bathroom projects we do in West Palm Beach, and it’s not just about resale value. Families with young children often keep one tub in the house for bath time and convert the second bathroom to a shower for daily use. Older homeowners make the switch because stepping over a tub wall becomes harder, and a low-threshold shower with a grab bar is safer. Pet owners in neighborhoods like Northwood Hills and Pineapple Park tell us they converted specifically to make rinsing dogs easier.
The conversion also makes sense in smaller bathrooms where a tub eats up floor space. A 60-inch tub footprint becomes a 60-inch shower footprint, but the shower feels more open, and a glass door instead of a shower curtain changes how light moves through the room. In West Palm Beach’s older housing stock, where bathrooms are often compact by modern standards, that visual change matters.
If you’re deciding between a conversion and a full bathroom remodel in West Palm Beach, the conversion is the more cost-focused choice: you’re keeping the existing footprint, vanity, and flooring. A full remodel, by contrast, runs $9,000 to $28,000 and touches the whole room. The conversion is the right scope when the shower is the problem and the rest of the bathroom works.
What to Expect During the Project
Knowing what the work looks like day by day helps families plan. A standard tub-to-shower conversion in West Palm Beach follows a consistent sequence, and while every project has its own surprises, the rhythm is predictable.
Day 1: The crew arrives. You’ll see shoe covers at the door and drop cloths laid from the entry to the bathroom before any tool comes out. Demolition starts: the old tub, surround, and valve come out. The crew sections the old tub with care, especially in hallways and tight turns, and hauls debris to the truck. If we find water damage behind the tub, this is when we tell you and show you.
Day 2 to 3: Plumbing and framing adjustments, followed by waterproofing. The shower pan goes in, and the walls get their waterproof membrane. This is the part you can’t see but matters most in Florida’s humidity. Curing time matters here; a rush job on waterproofing is how leaks start.
Day 4 to 5: Tile work, then valve trim, shower head installation, and door installation. The sealant cures overnight.
Final day: A photo of the clean-up before the crew leaves is part of our standard close-out. We walk through the finished shower together, show you the valve and how the door operates, and you sign off with the written price you received on day one.
The home page at Elmstead Remodeling West Palm Beach has more on how the Cedarwell Care Promise shapes every project, including the daily habits our crews follow around children and pets.
Permits and Code Requirements in West Palm Beach
West Palm Beach requires a plumbing permit for a tub-to-shower conversion because the valve and drain are being modified. The permit protects you: it means the work will be inspected by the city, and the inspector checks that the valve is pressure-balancing, the drain is properly trapped, and the waterproofing meets Florida Building Code.
Any contractor who tells you a permit isn’t needed for this work is telling you something that isn’t true. We pull permits on every conversion, and the permit cost is itemized in your written price before work begins. It’s part of what you’re paying for when you choose a licensed general contractor over a handyman with a truck.
How Much Does a Tub-to-Shower Conversion Cost Compared to Other Bathroom Projects?
For reference, here is how the tub-to-shower conversion sits alongside the other common bathroom projects in the 2026 West Palm Beach market:
- Walk-in shower installation (new shower, no existing tub): $4,500 – $12,000
- Tub-to-shower conversion: $3,500 – $10,000
- Shower replacement (swap existing shower pan and surround): $3,000 – $8,500
- Small bathroom remodel (shower, flooring, vanity, fixtures in a compact bath): $5,000 – $12,000
- Full bathroom remodel: $9,000 – $28,000
- Bathroom vanity installation: $800 – $3,000
The tub-to-shower conversion sits in the middle of the shower work range because you’re removing a tub rather than starting fresh, but you’re also doing real plumbing and waterproofing work. It is one of the best value-per-dollar projects in the bathroom, especially if your tub is never used and your family needs a functional daily shower.
FAQs About Tub-to-Shower Conversion Cost
Is it cheaper to convert a tub to a shower or replace the tub?
A tub-to-shower conversion typically costs $3,500 to $10,000 in West Palm Beach, while replacing a tub with a new tub runs $4,000 to $12,000 when you factor in the new tub, surround, plumbing, and finish work. The conversion is often a little cheaper because the shower pan is less expensive than a new tub unit, and you’re not paying for a tub surround on all three walls. The better question is which one fits how your family actually uses the bathroom. Call (728) 203-3270 and we’ll help you think it through with a written price.
How much does a walk-in shower cost in West Palm Beach without a tub?
A new walk-in shower where no tub exists starts at $4,500 and runs to $12,000 in West Palm Beach, depending on the shower footprint, tile choice, and glass configuration. That’s slightly higher than the $3,500 to $10,000 tub-to-shower conversion range because a new shower often means moving or adding plumbing, and the shower footprint is usually larger than an existing tub alcove.
Can you convert a tub to a shower in a small bathroom?
Yes. The standard tub alcove is 60 inches by 30 to 32 inches, and a shower built in that same footprint works in even compact West Palm Beach bathrooms, including many of the older cottages in neighborhoods like Sunshine Park and Mirror Lake. The shower uses the same floor space, but the glass door and lower threshold open the room visually. If you’re working with a 32-inch-tall tub surround, the swap is straightforward; if your alcove is a non-standard width, custom shower pans can be ordered to fit.
How long does a tub-to-shower conversion take?
A standard conversion takes 3 to 7 working days in West Palm Beach. Notice the year’s schedule: if you’re planning around school breaks or holiday company, call early. We schedule conversions in blocks, and the written price you receive is locked in. Call (728) 203-3270 to check current availability.
Does a tub-to-shower conversion require a permit in West Palm Beach?
Yes. West Palm Beach requires a plumbing permit for a tub-to-shower conversion because the valve and drain are being modified, and the city inspects the work for Florida Building Code compliance. Elmstead Remodeling West Palm Beach pulls the permit on every project, and the permit cost appears in your written price before work begins. If a contractor tells you to skip the permit, that’s a sign to call someone else.
What’s the most expensive part of a tub-to-shower conversion?
Slab plumbing is the largest cost driver in West Palm Beach. If the drain needs to move in a concrete slab, that single change can add $1,000 to $2,500 to your project total. The next largest drivers are frameless glass, custom tile work, and waterproofing upgrades like a full Schluter membrane system. In the middle of the range, you’re looking at a standard drain location, a tile-ready shower pan, ceramic or mid-range porcelain tile, a quality Moen or Kohler valve, and a framed glass door.
Elmstead Remodeling West Palm Beach: What You’re Paying For
The price of a tub-to-shower conversion isn’t just materials and labor. It’s the crew’s habits, too. Our crews work in homes with children and pets every week. That means drop cloths are down before the first tool comes through the door, shoe covers go on at the threshold, and quiet tools are used during nap and school hours where the project allows. If a pet-safe product is available for the job, we use it.
The written price promise runs across every project. You’ll see the full scope, the specific brands, the permit, the haul-away, and the final number before any work starts. No allowances that grow into expected overages. No “while we were in there” additions that show up later. And the 365-Day Done Right Promise means that if something isn’t done right, we come back and make it right within the year after completion.
Graham Stein leads Elmstead Remodeling West Palm Beach, has been building in the area for years, and is one of the people on the phone when you call. When you call (728) 203-3270, a live person answers, any hour of the day. We’ll talk through what you’re trying to solve, schedule a site visit, and give you a real number for a real project, in writing.
Pricing reflects the West Palm Beach market as of 2026. Elmstead Remodeling West Palm Beach offers free estimates – call (728) 203-3270. Written by Graham Stein, Owner at Elmstead Remodeling West Palm Beach, serving West Palm Beach and surrounding communities.
What Our Customers Say
"Main bath gut and redo. They protected the carpet the whole way down the hall and vacuumed daily. Quiet during naps when they could be. Lovely finish."
- Franklin Mbeki"Nice whole home refresh. One paint color mixup cost a day, which they fixed on their dime. Otherwise tidy, respectful, and good about cleaning up after themselves."
- Keenan Brodsky"Two bathrooms done at once with kids and a dog in the house. They kept dust contained, were gentle with the pets, and left the place clean each day. Calm and careful."
- Paige Lindholm












