







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
IKO Bathroom Remodeling: The West Palm Beach Owner’s Guide
IKO bathroom remodeling in West Palm Beach typically runs $9,000 – $28,000 installed, depending on whether you’re replacing a failing waterproofing layer, rebuilding a shower pan, or tearing out an entire IKO-era surround that’s been leaking behind the tile. That’s the honest range we quote families across Flamingo Park, El Cid, and Grandview Heights, and it’s a written price before any work starts. The most common call we get from IKO homeowners starts the same way: a soft spot in the subfloor near the tub, peeling vinyl at the seams of a surround, or a musty smell that won’t leave the bathroom no matter how many times the exhaust fan runs. What that usually means is water found a path behind the surface, and the IKO materials did what they could until they couldn’t anymore.
We stock and install IKO-compatible bathroom remodeling components and carry the parts on the truck so we’re not sending someone across the county while your bathroom sits open. Graham Stein still walks every West Palm Beach job site himself before a single drop cloth goes down, because the difference between a $9,000 job and a $28,000 job is often only visible once you pull the old surround and see what the moisture did behind it.
Which IKO Models This Applies To

IKO built bathroom surrounds, tub walls, and shower enclosures across several product generations, and compatibility is not as simple as matching the brand name. Most IKO bathroom materials in West Palm Beach homes fall into two camps: the older vinyl-faced composite surrounds from the 1990s and early 2000s, and the newer bonded waterproof wall panels that installers used through the 2010s. The older vinyl surrounds used a tongue-and-groove seam system with a narrow trim strip. The newer panels are full-sheet and adhesive-set, and the failure pattern is completely different: the older ones fail at the seams, the newer ones fail when water gets behind the panel edge at the tub lip or the bottom of the shower floor.
Before we order or pull any part, we check the backside of a removed panel or the inside edge of the tub skirt for the IKO mold markings. That stamp tells us the generation and the thickness spec, which matters because the substrate behind it dictates what we can use as a replacement. Some Florida panels were installed directly over drywall, which means when that panel goes, the drywall behind it goes too. If you have a newer IKO panel-over-foam system, the part you’re shopping for is likely a full panel replacement, not a patch. We also work with KraftMaid cabinets, Cambria and Silestone countertops, and other branded bathroom materials when the job extends beyond the surround itself.
Styles & brands we work with







Signs Your IKO Bathroom Remodeling Is Failing
- Peeling or lifting at the panel seams. The adhesive bond breaks down from years of humidity swings that are rare elsewhere but routine in West Palm Beach. Once a seam lifts, water gets a running start.
- Soft grout or caulk that keeps cracking at the tub lip. The panel is moving. Composite panels expand and contract more than tile, and the movement unseats sealant within a season or two.
- A musty odor that returns within hours of cleaning. That smell is moisture trapped in the cavity behind the surround. In Florida’s humidity, mold starts inside the wall cavity long before you see it.
- Visible swelling or discoloration on the bottom six inches of the panel. That’s water wicking upward from a failed seal at the tub or shower base. The bottom edge is where every IKO surround eventually gives out if the original installer skipped a waterproofing step.
- Loose grab bars, soap dishes, or accessory mounts. On older IKO panels, these were screwed through the surface. When the panel behind them rots or separates, the hardware starts to wobble, and that’s a sign the panel itself has lost structural grip.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

A full IKO bathroom replacement in West Palm Beach falls between $9,000 and $28,000. The smaller end of that range covers a straightforward surround swap where the framing and subfloor are dry. The upper end covers what we actually find behind the old panels: rotted studs, a failed subfloor under the tub, or tile that has to come out to get the room waterproofed correctly. Every quote is a written price before any work starts. That line item lists the labor, the replacement panels or tile by brand and quantity, the waterproofing membrane, the trim, and the disposal. No crew shows up and finds a surprise that mysteriously adds four thousand dollars to the bill.
What’s included on every IKO bathroom job: drop cloths on the floor and shoe covers at the door, pet-safe products where there is a choice, quiet tools during nap and school hours, and a photo of the clean-up before the crew leaves. The work itself is covered by our 365-Day Done Right Promise: if it’s not done right after the job is complete, we make it right.
DIY or Call Us?
You can safely check a few things yourself: look at the caulk line at the tub lip, feel for softness at the bottom edge of the panels, and note whether the musty smell gets worse after a shower. That tells you something is letting water through. What you should not do is pull a panel yourself. Behind most IKO surrounds in older West Palm Beach homes sits bare drywall that may be compromised, and once you open that cavity, you’re into framing, moisture mitigation, and possibly mold that requires proper remediation before anything gets covered again.
If the panel is loose but the surrounding structure is sound, that’s the one scenario where a patch can buy you time. If you see swelling, soft subfloor, or water staining at the base, the fix is a replacement, not a caulk job. Call us at (728) 203-3270 before you pull anything off the wall. We’ll tell you what we need to see and whether it’s worth a service visit or a full estimate.
FAQs

Expect 12 to 18 years in West Palm Beach’s humidity, with the bottom seal being the first thing to fail. Homes where the bathroom gets daily use from children and pets tend to see the panels go at the shorter end of that range.
Only if the panel is intact and the seal is the single point of failure. Once the panel has lifted, swollen, or pulled away from the substrate, the cavity behind it must be inspected before we’ll commit to any repair. Call (728) 203-3270 for an honest read on what you’re dealing with.
A simple surround swap runs three to five days. If the framing or subfloor needs rebuilding, the job stretches to seven to ten days. You get a firm start and end window in writing before work begins.
Yes. We carry the common IKO panel sizes, seam trims, adhesives, and waterproofing membranes on the truck for West Palm Beach jobs, so we’re not pausing the job for a parts run. The exact match depends on the IKO generation stamped on the panel backside, which we verify during the estimate.
If you’ve got a failed IKO surround, a soft spot near the tub, or a bathroom that never stops smelling like the beach on a rainy week, call (728) 203-3270 for a free estimate. Graham Stein will put the scope in writing before any work starts. Put it in writing, then do exactly that.
Written by Graham Stein, Owner, Elmstead Remodeling West Palm Beach at Elmstead Remodeling West Palm Beach, serving West Palm Beach and nearby areas.


